The Nordseecluster

Credits: Vestas

Project Overview

The Nordseecluster integrates multiple wind farm sites located in the eastern region of the German North Sea. With a combined capacity of 1.6 gigawatts (GW), this cluster aims to generate around 6,400,000 megawatt-hours (MWh) of renewable energy annually, providing electricity to approximately 1,600,000 households. 

The development of the Nordseecluster will progress in two phases. The initial phase, Nordseecluster A, comprising NC 1 and NC 2, OES Group have been selected to supply a specialist internal and external ICCP system for the project.
Externally we have designed a boat landing mounted corrosion protection system to support the TP less foundation reducing significant secondary steel and T and I when comparing other CP systems suitable for these foundations. Internally the MP will be protected by OES Groups market leading internal ICCP system.

 OES Group will support the project with complete Design, System manufacturing, onshore installation and testing as well as offshore switch on.

Solution

Foundations
0 +
Year operational
2029

Partners

Get in touch with us

Lorem ipsum dolor sit amet consectetur. Elementum adipiscing arcu adipiscing diam vel vivamus. Sit neque nibh vulputate turpis nulla tempus integer enim. Eu nibh augue volutpat feugiat scelerisque ac arcu. Pulvinar est dictumst sed hendrerit turpis tempor adipiscing. Lorem ipsum dolor sit amet consectetur. Elementum adipiscing arcu adipiscing diam vel vivamus. Sit neque nibh vulputate turpis nulla tempus integer enim. Eu nibh augue volutpat feugiat scelerisque ac arcu. Pulvinar est dictumst sed hendrerit turpis tempor adipiscing.